Documents
- 2019 Meeting Schedule
- 2018 ATM Presentation
- ADA Grant for the Elevator Close-out Report
- Town Hall Renovation, Historic Preservation & Expansion of Topsfield Town Hall
- Charter
- Town Hall Committee Members, as of June, 2019
Newsletter: November 29, 2017
Town Hall Plan Design
- Town Hall Floor Plans 4/2017
- Design Developemnt Plans with elevations (11/9/16)
- Exterior west elevation draft drawings (7/27/16)
- Interior Floor Plans (7/27/16)
Owners Project Management Services Phase
- RFP for the Project
- Addendum #1 for the RFP
- Budget Summary of Town Hall Project
- Floor Plan dated 6-22-16
Schematic Design Phase
Facade Renovation Project
Background Information: List of Documents
- DRA - Town Building Assessment Study & Capital Master Plan 2013
- Adams & Smith-Finch & Rose - Topsfield Exterior Conditions Report
- Adams & Smith-Finch & Rose - Topsfield Exterior Conditions Pictures
- Adams & Smith -Finch & Rose Exterior Conditions Plan
- 2007 Town Hall Building Committee Report
- Galante - Town Hall Building Program 2002
- RI Analytical - Hazardous Materials Inspection Report 2003
- May 2015 Town Meeting Powerpoint Presentation